|
Brant Street Pier is a signature destination and attraction located in Spencer Smith Park at the Waterfront at Downtown Burlington. It extends 137 metres over Lake Ontario that provides views of the lake and Burlington's shoreline. It officially opened during the Sound of Music Festival in Spencer Smith Park on the Father's Day weekend of June 2013. The pier is the final phase of the Downtown Waterfront Project: expansion of the Art Gallery of Burlington, construction of the 380-vehicle Locust Street parking facility, and opening of Discovery Landing. == Construction == The construction of the pier began on 2006 with a budget of $14.4 million. After series of delays and issues, the pier opened in June 2013. A well-known philanthropist, who was going to donate a $10 million sculpture Untitled (Head Through Belly), pulled out of the deal after locals opposed to it. Construction for the summer in 2008 was stopped because a crane fell into Lake Ontario. Later, the majority of the pier's reinforcement beams had to be fixed because they were found to be lacking in foundation. In 2012, the city council decided to remove a large wind turbine from the structure. The proposed plan for the length of the pier was supposed to be 100 meters more than the constructed. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Brant Street Pier」の詳細全文を読む スポンサード リンク
|